Gold Coast beach restoration work delayed by wild Easter surf
Sand-pumping work to fix the Gold Coast’s eroded beaches have been put on hold ahead of wild surf expected over the Easter long weekend. A dredging barge was brought in to replenish more than 4 million cubic metres of sand that washed away from beaches during ex-Tropical Cyclone Alfred, but it was docked following wet